Manufacturing · 2025

Automotive Tier-2 Line Automation

PLC/SCADA modernization and OEE tracking for a 12-station assembly line.

Client
Sample Automotive Inc.
Sector
Manufacturing
Location
Bursa
Year
2025

Need

Legacy controls caused frequent stops; production data was collected manually.

Solution

The line was re-engineered with modern PLCs and central SCADA; data acquisition at each station enabled a real-time OEE dashboard.

Results

  • 27%

    OEE increase

  • 41%

    Downtime reduction

  • 8 mo

    Payback period